Blueberry Acres

The Blueberry Acres Wind Energy Project is a proposed renewable energy facility with a total capacity of up to 61.2 MW. The project will be comprised of turbines with a nameplate capacity between 5.9 to 7.2 MW. The facility would be located on privately-held land in Cumberland county, near highway 104.

The project is being developed through a partnership with First Nation communities and SWEB Development LP (SWEB Energy), a North American subsidiary of W.E.B. Group.

Location Description
Cumberland county, near highway 104.
Project Status
Proposed
Purpose
Local Grid
Onshore/Offshore
Onshore
Number of Turbines
8
Total Project Capacity (MW)
61.20
Commissioning Year
2028
Signed Offtake Deals
No
Proposed Site Plan

Turbines in this project

Turbine Model Rotor Diameter (m) Turbine Rated Capacity (kW)
BLUEACRES1 45.555523, -63.66339 Unspecified ?-7200 7200.00
BLUEACRES2 45.563681, -63.666812 Unspecified ?-7200 7200.00
BLUEACRES3 45.546376, -63.643753 Unspecified ?-7200 7200.00
BLUEACRES4 45.56957, -63.665066 Unspecified ?-7200 7200.00
BLUEACRES5 45.570154, -63.657182 Unspecified ?-7200 7200.00
BLUEACRES6 45.562382, -63.653369 Unspecified ?-7200 7200.00
BLUEACRES7 45.539793, -63.649784 Unspecified ?-7200 7200.00
BLUEACRES8 45.553908, -63.648036 Unspecified ?-7200 7200.00