Weavers Mountain Wind

The Weavers Mountain Wind Energy Project (the Project) is a 94.4 megawatt (MW) wind
energy project proposed by WEB Weavers Mountain Wind GP Inc., Glooscap Energy #2
Limited Partnership (as represented by its general partner Glooscap Energy #2 GP Ltd.), and
SWEB Development Limited Partnership (as represented by its general partner SWEB
Development Inc.), carrying on business as WEB Weavers Mountain Wind Limited
Partnership (the Proponent).

The Project is centred on Weavers Mountain, at the border of the St. Mary’s River,
Antigonish West River, and Barney’s River watersheds, between the communities of Beaver
Meadow, Kenzieville, Eden Lake, and Lochaber, along the county boundary between
Antigonish and Pictou Counties, Nova Scotia

The Project will use up to 16 wind turbines with a maximum hub height of 125 metres (m)
and a maximum rotor diameter of 163 m. The exact wind turbine model has not yet been
selected for the Project. The turbine locations are shown in Drawing 2.2. Previous and
current land use within the main Study Area is timber harvesting and recreation.
Upon approval of the EA, construction activities are proposed to begin in winter 2024 with
major civil and electrical construction activities planned for Q2 2024. It is anticipated that the
Project will finish construction and reach commercial operation by the end of 2025 and is
expected to be operational for a minimum of 25 years.

Location Description
The Project is centred on Weavers Mountain, at the border of the St. Mary’s River,
Antigonish West River, and Barney’s River watersheds, between the communities of Beaver
Meadow, Kenzieville, Eden Lake, and Lochaber, along the county boundary between
Antigonish and Pictou Counties, Nova Scotia
Project Owner
LandOwners
Project Status
Approved
Purpose
Local Grid
Onshore/Offshore
Onshore
Number of Turbines
16
Total Project Capacity (MW)
99.20
Commissioning Year
2025
Signed Offtake Deals
No
Proposed Site Plan

Turbines in this project

Turbine Model Rotor Diameter (m) Turbine Rated Capacity (kW)
WEAVERSMTN1 45.541, -62.159 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN2 45.539, -62.173 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN3 45.539, -62.182 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN4 45.542, -62.202 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN5 45.546, -62.214 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN6 45.535, -62.218 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN7 45.528, -62.218 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN8 45.527, -62.236 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN9 45.52, -62.23 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN10 45.514, -62.241 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN11 45.521, -62.246 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN12 45.535, -62.203 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN13 45.527, -62.208 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN14 45.522, -62.216 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN15 45.504, -62.238 Unspecified 162-5000 162.00 5000.00
WEAVERSMTN16 45.525, -62.195 Unspecified 162-5000 162.00 5000.00

Project Events Block

October 2024