Kmtnuk Wind Power Project

The Proponent proposes to construct and operate an onshore wind energy project with up to
16 wind turbines near the communities of Earltown, McCallum Settlement, and North River in
Colchester County, Nova Scotia (Drawing 2.1). The approximate center of the Project is
located at 45.543379° N, 63.280918° W.

The Project turbines will have a nominal nameplate capacity of between 5.2 megawatts
(MW) to 7.0 MW, which represents the range of turbine models being considered for the
Project. For the purposes of this EA’s noise and shadow flicker modelling, the Nordex N163
5.9 MW wind turbine generator was selected as it represents the general range of turbines
that are being considered for the Project. The turbine locations are shown on Drawing 2.2.
The Project also consists of access roads, an interconnecting transmission line, a substation,
an O&M building, and a switching station connection to the Nova Scotia Power (NS Power)
grid. The Project is being developed to support the production of Certified Green hydrogen
and ammonia in Nova Scotia. EverWind expects to enter into a “sleeved” power purchase
agreement which will enable its production facility in Point Tupper, Nova Scotia, to purchase
renewable energy from the Project.

The Project lies within two primary watersheds, including the Salmon/Debert Primary
Watershed (1DH) and the River John Primary Watershed (1DO). Watercourses within the
Study Area primarily drain south through the Salmon/Debert Primary Watershed, eventually
discharging to the Bay of Fundy. The northernmost stretches of the Study Area drain north
through the River John Primary Watershed, which ultimately discharges into the
Northumberland Strait. The Study Area consists primarily of Crown land, with several parcels
of private land. Lands are currently utilized primarily for forestry and recreational use.
Upon approval of the EA, construction activities are proposed to begin in the spring of 2024
and once constructed, the Project is expected to be operational for a minimum of 35 years

Location Description
North of McCallum Settlement, Colchester County, Nova Scotia
Project Owner
Project Status
Approved
Purpose
Hydrogen
Onshore/Offshore
Onshore
Number of Turbines
16
Total Project Capacity (MW)
112.00
Commissioning Year
2025
Signed Offtake Deals
No
Start Date
Proposed Site Plan

Turbines in this project

Turbine Model Rotor Diameter (m) Turbine Rated Capacity (kW)
KMTNUK1 45.5835, -63.2618 Nordex N163/5.X 163.00 5900.00
KMTNUK2 45.5819, -63.2715 Nordex N163/5.X 163.00 5900.00
KMTNUK4 45.5587, -63.2704 Nordex N163/5.X 163.00 5900.00
KMTNUK5 45.5542, -63.2718 Nordex N163/5.X 163.00 5900.00
KMTNUK6 45.5415, -63.2609 Nordex N163/5.X 163.00 5900.00
KMTNUK7 45.5343, -63.2527 Nordex N163/5.X 163.00 5900.00
KMTNUK8 45.529, -63.2455 Nordex N163/5.X 163.00 5900.00
KMTNUK10 45.5441, -63.3164 Nordex N163/5.X 163.00 5900.00
KMTNUK11 45.5373, -63.3168 Nordex N163/5.X 163.00 5900.00
KMTNUK12 45.5321, -63.3085 Nordex N163/5.X 163.00 5900.00
KMTNUK13 45.5257, -63.3099 Nordex N163/5.X 163.00 5900.00
KMTNUK14 45.5279, -63.2996 Nordex N163/5.X 163.00 5900.00
KMTNUK15 45.5071, -63.3275 Nordex N163/5.X 163.00 5900.00
KMTNUK16 45.5093, -63.3181 Nordex N163/5.X 163.00 5900.00
KMTNUK17 45.5031, -63.3179 Nordex N163/5.X 163.00 5900.00
KMTNUK20 45.5163, -63.3024 Nordex N163/5.X 163.00 5900.00

Project Events Block